Fresenius (medical care)
The ground was treated with lime stabilisation combined with a cut and fill operation due to a very steeply sloping site.
A steel frame was utilised with twin bay portals.
Client - Orchard Developments Ltd
Architects - Red 4
Contractor - Winfield Construction Ltd
Contract sum - £3.0m